Salzburger Flughafen GmbH – Central energy centre

Project information

Name / Location

Salzburg Airport – Electrotechnical systems for the central energy centre

Assignment

Planning

Client

Salzburger Flughafen GmbH, Salzburg

Production costs electrical

net approx. € 1,300,000.00

Planning period

2015 to 2017

Technical data

  • Electrical installations of an underfloor energy centre
  • Medium-voltage system
  • Emergency power system
  • Low-voltage distribution
  • Earthing and lightning protection system
  • Lighting system incl. safety lighting
  • Fire alarm system
  • Access system

Activities

  • Stocktaking
  • Preliminary design
  • Draft
  • Submission
  • Implementation planning
  • Tender preparation
  • Award of contract
  • Consultancy during execution