Project information
Name / Location | Salzburg Festival – Safety-related adaptation and refurbishment of electrical engineering |
Assignment | Planning and local construction supervision |
Client | Salzburger Festspielfonds, Salzburg |
Planning period | 2015 to ongoing |
Period LCS | 2015 to ongoing |
Technical data
- Renovation of the entire electrical system (high and low voltage system)
- Adaptation of the power distribution system incl. safety power supply
- Renewal of the safety lighting system
- Renewal of the evacuation public address system incl. stage manager system
- Renewal of the fire alarm system
- Extension of the property radio system (digital radio)
Activities
- Stocktaking
- Preliminary design
- Preliminary design
- Submission planning
- Implementation planning
- Tender preparation
- Award of contract
- Local construction supervision (LCS)