Project information
Name / Location | S7 Fürstenfeld motorway, Styria and Burgenland |
Assignment | Planning |
Client | ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien |
Total construction costs | net approx. € 17,500,000.00 |
Planning period | 2006 to ongoing |
Technical data
- Tunnelling facilities:
UFT Speltenbach 980m
Rudersdorf tunnel 2,900m
UFT Königsdorf 696m - Tunnel cross-section: 2-lane in directional traffic or two-way traffic (UFT Königsdorf)
- Open-air section: Pre-portal equipment based on RVS 09.01.25 with a total construction lot length of approx. 29 km
Activities
- Stocktaking
- Preliminary design
- Draft
- Submission planning (§7 procedure according to STSG)
- Handling of EIA procedure
- Implementation planning
- Tender preparation
- Consulting engineering