S16 Arlberg motorway – Arlberg tunnel

Project information

Name / Location

S16 Arlberg motorway, Arlberg tunnel Tyrol/Vorarlberg
Partial refurbishment 1 / escape routes via supply air duct
Electromechanical equipment (EM equipment)

Assignment

Planning

Client

ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien

Total construction costs

net approx. € 55,000,000.00

Planning period

2010 to 2018

Technical data

  • Tunnel length: 15,508m
  • Tunnel cross-section: 2 lanes with two-way traffic
  • Clearance area: Pre-portal equipment based on RVS 09.01.25 with additional equipment for the operation of thermal scanners at both portals

Activities

  • Inventory surveys
  • Preliminary design
  • Draft
  • Submission planning (§7 procedure according to STSG)
  • Implementation planning
  • Tender preparation
  • Award of contract
  • Consulting engineering during the construction phase