Project information
Name / Location | A22 Danube riverside motorway, Tunnel Islam Vienna / Lower Austria |
Assignment | Planning |
Client | ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien |
Total construction costs | net approx. € 450,000.00 |
Planning period | 2014 to 2015 |
Technical data
- Tunnel length:
Tube RFB Reichsbrücke 325m
Tube RFB Floridsdorf 330m - Tunnel cross-section: 4-lane in directional traffic
Activities
- Stocktaking
- Preliminary design
- Preliminary design
- Implementation planning
- Tender preparation
- Consulting engineering