A22 Danube riverside motorway – Tunnel Islam

Project information

Name / Location

A22 Danube riverside motorway, Tunnel Islam Vienna / Lower Austria
Tunnel renovation
Electromechanical equipment (EM equipment)

Assignment

Planning

Client

ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien

Total construction costs

net approx. € 450,000.00

Planning period

2014 to 2015

Technical data

  • Tunnel length:
    Tube RFB Reichsbrücke 325m
    Tube RFB Floridsdorf 330m
  • Tunnel cross-section: 4-lane in directional traffic

Activities

  • Stocktaking
  • Preliminary design
  • Preliminary design
  • Implementation planning
  • Tender preparation
  • Consulting engineering