A1 West motorway – Liefering tunnel

Project information

Name / Location

A1 West motorway, Liefering tunnel Salzburg
Refurbishment and repair as well as establishing conformity with the Road Tunnel Safety Act (STSG)
Electromechanical equipment (EM equipment)

Assignment

Local construction supervision

Client

ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien

Total construction costs

net approx. € 11,300,000.00

Construction period

2015 to 2018

Technical data

  • Tunnel length:
    Tube direction Vienna 503.50m
    Tube direction Munich 503.50m
  • Tunnel cross-section 3- or 4-lane with on- and off-ramps in the tunnel
  • Open-air section: Pre-portal equipment based on RVS 09.01.25 with additional equipment for the entrance and exit ramps and including system integration into the traffic control system of the open section.

Activities

  • Participation in the preparation of tenders
  • Award of contracts
  • Local construction supervision
  • Support during the warranty period