Project information
Name / Location | A10 Tauern motorway, Oswaldiberg tunnel Carinthia |
Assignment | Local construction supervision |
Client | ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien |
Total construction costs | net approx. € 45,000,000.00 |
Construction period | 2015 to 2017 |
Technical data
- Tunnel length:
Tube direction Villach 4,297m
Tube direction Salzburg 4,307m - Tunnel cross-section 2-lane in directional traffic
- Clearance area: Pre-portal equipment based on RVS 09.01.25 with additional equipment for the access and exit ramps
Activities
- Local construction supervision
- Supervision during warranty period