A10 Tauern motorway – Oswaldiberg tunnel

Project information

Name / Location

A10 Tauern motorway, Oswaldiberg tunnel Carinthia
Refurbishment and repair as well as establishing conformity with the Road Tunnel Safety Act (STSG)
Electromechanical equipment (EM equipment)

Assignment

Local construction supervision

Client

ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien

Total construction costs

net approx. € 45,000,000.00

Construction period

2015 to 2017

Technical data

  • Tunnel length:
    Tube direction Villach 4,297m
    Tube direction Salzburg 4,307m
  • Tunnel cross-section 2-lane in directional traffic
  • Clearance area: Pre-portal equipment based on RVS 09.01.25 with additional equipment for the access and exit ramps

Activities

  • Local construction supervision
  • Supervision during warranty period