S7 Fürstenfeld motorway

Project information

Name / Location

S7 Fürstenfeld motorway, Styria and Burgenland
New motorway construction incl. tunnels
Electromechanical equipment (EM equipment)

Assignment

Planning

Client

ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien

Total construction costs

net approx. € 17,500,000.00

Planning period

2006 to ongoing

Technical data

  • Tunnelling facilities:
    UFT Speltenbach 980m
    Rudersdorf tunnel 2,900m
    UFT Königsdorf 696m
  • Tunnel cross-section: 2-lane in directional traffic or two-way traffic (UFT Königsdorf)
  • Open-air section: Pre-portal equipment based on RVS 09.01.25 with a total construction lot length of approx. 29 km

Activities

  • Stocktaking
  • Preliminary design
  • Draft
  • Submission planning (§7 procedure according to STSG)
  • Handling of EIA procedure
  • Implementation planning
  • Tender preparation
  • Consulting engineering