Project information
Name / Location | S16 Arlberg motorway, Arlberg tunnel Tyrol/Vorarlberg |
Assignment | Planning |
Client | ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien |
Total construction costs | net approx. € 55,000,000.00 |
Planning period | 2010 to 2018 |
Technical data
- Tunnel length: 15,508m
- Tunnel cross-section: 2 lanes with two-way traffic
- Clearance area: Pre-portal equipment based on RVS 09.01.25 with additional equipment for the operation of thermal scanners at both portals
Activities
- Inventory surveys
- Preliminary design
- Draft
- Submission planning (§7 procedure according to STSG)
- Implementation planning
- Tender preparation
- Award of contract
- Consulting engineering during the construction phase