Wienenergie – Control technology for Ybbstal hydropower plants

Project information

Name / Location

Wienenergie – Control technology and control room equipment for Ybbstal hydropower plant

Assignment

Planning and local construction supervision

Client

Wien Energie GmbH, Wien

Production costs electrical

net approx. € 1,300,000.00

Planning period

2014 to 2016

Period LCS

2015 to 2016

Technical data

  • Renewal of the plant control system and data integration of the hydropower plants
    • Opponitz
    • Gaming I
    • Gaming II
    • Hausmening
  • Including connection to the Spittelau district heating network control centre

Activities

  • Stocktaking
  • Implementation planning
  • Tender preparation
  • Contract award
  • Local construction supervision (LCS)