Project information
Name / Location | Wienenergie – Control technology and control room equipment for Ybbstal hydropower plant |
Assignment | Planning and local construction supervision |
Client | Wien Energie GmbH, Wien |
Production costs electrical | net approx. € 1,300,000.00 |
Planning period | 2014 to 2016 |
Period LCS | 2015 to 2016 |
Technical data
- Renewal of the plant control system and data integration of the hydropower plants
- Opponitz
- Gaming I
- Gaming II
- Hausmening
- Including connection to the Spittelau district heating network control centre
Activities
- Stocktaking
- Implementation planning
- Tender preparation
- Contract award
- Local construction supervision (LCS)