A9 Phyrn motorway – Gleinalm tunnel

Project information

Name / Location

A9 Phyrn motorway, Gleinalm tunnel Styria
New construction of 2nd tube and adaptation of 1st tube
Electromechanical equipment (EM equipment)

Assignment

Planning

Client

ASFiNAG Autobahnen- u. Schnellstraßen-Finanzierungs-AG, Wien

Total construction costs

net approx. € 39,500,000.00

Planning period

2011 to ongoing

Technical data

  • Tunnel length:
    East tunnel: 8,291m
    West tunnel: 8,320m
  • Tunnel cross-section: 2-lane in directional traffic
  • Clearance area: Pre-portal equipment based on RVS 09.01.25 with a total construction lot length of 13,345m

Activities

  • Inventory surveys
  • Preliminary design
  • Draft
  • Submission planning (§7 procedure according to STSG)
  • Implementation planning
  • Tender preparation
  • Award of contract
  • Consulting engineering